Works on the railway line No. 7 Warszawa Wschodnia Osobowa – Dorohusk

Works on the railway line No. 7 Warszawa Wschodnia Osobowa – Dorohusk on the section Warsaw – Otwock – Dęblin – Lublin, section Otwock – Lublin in km 26,050 – 175,850" as part of the Operational Programm Infrastructure and Environment 5.1-11 named "Works on the railway line No. 7 Warszawa Wschodnia Osobowa – Dorohusk on the section Warsaw – Otwock – Dęblin – Lublin, stage I.

The works include (among others):

  • Installation of electrical supply systems for non-traction loads (LPN),

  • Installation of cabling for power systems up to 1 kV,

  • Removal of LV and MV power collisions with newly built infrastructure facilities.

    .

.

Completion: August 2019
Employer:

Astaldi S.p.A., 00156 Roma, via G.V.Bona 65 (Włochy)

Investor: PKP PLK S.A.

 

Linia L

The 2nd Line of the Warsaw Metro. Execution of complete electrical installations at the C17 station

The 2nd Line of the Warsaw Metro. Execution of complete electrical installations at the C17 station:

  • cables supporting structures,
  • power supply and automatic control of the ventilation room, water system valves and local pumping stations,
  • earthing, equipotential system and monitoring of stray electrical currents,
  • power supply system and lightning system,
  • power and control cabling,
  • contact line system.

 

Completion: 02.10.2018
Employer:

Astaldi S.p.A., Rome, Italy

 

Linia L

Redevelopment (expansion) of the Water Treatment Station “Brzozowa” in Gościcino (Q = 160 m3/h) with associated facilities

Redevelopment (expansion) of the Water Treatment Station “Brzozowa” in Gościcino (Q = 160 m3/h) with associated facilities, including:

  • construction of water purification plant, installation of process pipelines, installation of water pump station and inter-tank pump house,
  • demolition of a process equipment building, process water tank and raw water tank,
  • execution of new pedestrian routes, internal road system with exit from Brzozowa Street, lighting and drainage of the area, greenery,
  • execution sanitary system with terminals in the area of the Water Treatment Station "Brzozowa",
  • reconstruction of power supply and overhead line,
  • repair of treated water tanks.

 

Completion: April 2019
Employer:

Przedsiębiorstwo Wodociągów i Kanalizacji Sp. z o.o., Gdynia

 

 

Linia L

Complete electrical installation for the Jaguar Land Rover s.r.o. in Nitra (Slovakia)

Complete electrical installation (for the Oven and the Work Decks) and Network Installation packet related to expansion of the Jaguar Land Rover s.r.o. in Nitra (Slovakia).

 

Completion date: 15.01.2018
Employer:

Dürr System AG, 74321 Bietigheim-Bissingen, Carl-Benz-Straße 34 (RFN)

Investor: Jaguar Land Rover s.r.o. Nitra (Słowacja)

 

 

Linia L

Dismantling of the traction overhead line as part of the modernization of the railway line No. 7 Warszawa Wschodnia – Dorohusk

Dismantling of the traction overhead line as part of the modernization of the railway line No. 7 Warszawa Wschodnia – Dorohusk (Stage I, section Dęblin – Lublin, km 119,500 ÷ 166,100)

.

Completion date: 08.09.2017
Employer: Astaldi S.p.A., 00156 Roma, via G.V.Bona 65 (Włochy)
Investor: PKP PLK S.A.

 

 

Linia L

 

Senior Residence

Senior Residence Residential Building with Therapeutic Centre and Nursery School in Gdańsk, Przemyska St. Construction of a complex of two buildings together with obtaining a permit to use.

The building has 89 single and double rooms with bathroom, 24 hours service facilities, nursery school, clinic and kitchen.

.

Total gross area of the building: 4 735 m2
Usable floor area of the building: 7 293 m2
Number of overground floors: 3
Number of underground storeys: 1
Completion date: the 30th of November 2018
Employer:

Millenium Inwestycje Sp. z o.o., 40-750 Katowice, ul. Hierowskiego 2

Investor: Evangelisch-Luterisches Diakoniewerk Neuendettelsau (Niemcy)
   

 

 

Linia L

4 * HOTEL IN CHARZYKOWY

Construction of a hotel in Charzykowy with 69 double rooms, 6 appartments, 3 conference rooms, swimming pool and SPA

.

Usable surface: 9 521,44 m2
Client: PK Sp. z o.o. 89-600 Chojnice, ul. Adama Asnyka 2

 

 

Linia L

 

Apart Hotel "Gwiazda Morza" in Władysławowo

Construction of tourist apartments building in Władysławowo, Hryniewieckiego Street. Four-storey building with underground garages, commercial units and 33 apartments.

Structure: reinforced concrete
Usable surface: 1 571,76 m2
Scope of works: cold shell, roofing works, outdoor installations
Client: Gwiazda Morza Sp. z o.o. Sp. k.a., Władysławowo

 

 

Linia L

 

 

Transmission capacity Olkusz

Increase of the transmission capacity of the Siersza – Olkusz – 110 kV transmission lines, line 1 and line 2.

 

Completion 30.12.2017
Employer

Tauron Dystrybucja S.A., Oddział w Będzinie, KrakówStrzebielinko

 

 

 

Linia L

 

Production hall in Strzebielinko

Construction of a production hall, 2144 m2 area, as a part of the project named “Implementation of new technology of copper wires drawing” in Strzebielinko, Gniewino Commune

 

Employer

WBS Spółka z ograniczona odpowiedzialnością Spółka Komandytowa, Strzebielinko

 

 

Linia L

 